Electrical installation of North Americas most powerful mine hoist for the production shaft at the K3 mine site in Esterhazy, Saskatchewan. This project was completed within an operating mine environment with zero impacts to existing production. The work spanned multiple levels of the South Shaft headframe with a high degree of logistical complexity.
Electrical installation of the T3 Cage Hoist Upgrade at the Thompson, Manitoba mine site. The scope of work included new controls and power train within the existing headframe. The project was completed within an operating mine environment with zero unplanned impacts to existing production. The work spanned multiple levels of the T3 headframe with a high degree of logistical complexity.
Underground West Mine Expansion in Rocanville, SK. The multi-phase project included underground distribution of 25kV and 15kV surface to underground feeders, 25kV and 15kV unit substations, 25kV GIS substation complete with cables and terminations, 15 unit substation sleds, various 4160V and 600V equipment and VLF testing. All electrical and instrumentation for underground equipment. Headframe changeover from service to production. Various stages of this project was completed with 24-hour coverage and multiple shift types to meet project milestones. Provided pre-commissioning and start-up assistance.
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.